Index Every US public charity, on the record

Magnusson Klemencic Associates Foundation

Seattle, Washington Accepts applications
EIN 81-2063837Private foundationLatest return year ending March 2026

Applications

How to apply

Magnusson Klemencic Associates Foundation accepts applications, as stated on its return. What it filed:

Form of applications and materials
Research Topic Applcaiton: Topic how the research will meet the misison of the Foundation and need of the indsutry proposed reasearch dissemination plan principal investigator industry support proposed timing funding request contact information.
Deadlines
None
Restrictions
Must support the mission of the Foundation and the industry.

From its returns

What it gave

Magnusson Klemencic Associates Foundation paid $127,500 in grants in the year ending March 2026.

Grants paid
$127,500
Year ending March 2026
Grants listed
9
To organizations, on that return
Typical grant
$27,500
Half fall between $24,375 and $35,000
Assets at year end
$1,028,511
Fair market value
Year endingGrants paidGrants listed
March 2026$127,5009
March 2025$188,7507
March 2024$142,4570

From the foundation’s Form 990-PF returns for the years ending March 2024 to March 2026.

Focus and places

What it funds, and where

From the 16 grants listed on its returns for the years ending March 2024 to March 2026. A grant counts toward a focus only when it is linked to the charity that received it: 2 of 16 are.

Focus, by share of linked grant dollars

  • Environment100%

Where it gave, by number of grants

  • Virginia11
  • Washington2
  • New Mexico2
  • West Virginia1

From the foundation’s Form 990-PF returns for the years ending March 2024 to March 2026.

Grants

Recent grants to organizations

The largest grants on its latest returns, as filed. A name links to the charity’s profile when the match is certain.

RecipientYear endingAmountPurpose
2030 Inc Architecture 2030 IncSanta Fe, New MexicoMarch 2026$50,000A-105: Climate Positive Design for the Exterior Built Environment: Identify gaps areas for usage improvemet and integration with the existing Pathfinder tool and existing dataset. Update the tool with currently existing planning and landscape datasets as well as basic civil materials. Execute tool interface and output advancement capabilities.
West Virginia University FoundationMorgantown, West VirginiaMarch 2026$30,000This project investigates a supplemental damping system for a floor system long-span truss or stadium raker among other options. The testing involves vibration analysis to confirm anticipated performance.
Charles Pankow FoundationHaymarket, VirginiaMarch 2026$25,000RGA 01-25: Behavior of Modular Steel Plate Floor Assemblies: This project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the AISC Need for Speed initiative to reduce the time from conception to occupancy for steel building structures.
Charles Pankow FoundationMcLean, VirginiaMarch 2026$22,500RGA #04-23 Steel Mass Timber Hybrid Diaphragms and Vibration: aims to investigate the diaphragm and vibration behavior of steel-cross laminated timber CLT floors. This research will catalyze innovation within the building construction field by enabling efficient and effective designs of steel-CLT floors. Steel-CLT buildings are currently being constructed throughout the US. However the existing design guides for diaphragm and vibration design have not been developed through experimental data. Therefore the design of steel-CLT buildings may be overly conservative.
Charles Pankow FoundationMcLean, VirginiaMarch 2026Not statedRGA 02-21 This research seeks to develop and experimentally validate bolded splice details for composite plate shear walls-concrete filled CPSW-CF to enable nationwide application of this structural system. The use of CPSW-CF structures leverage steel pre-fabrication in the shop and stay-in-place formwork to reduce the time spent on site and accelerates the construction schedule. Professor Bruneau from the University of Buffalo serves as the principal investigator.
Building TransparencySeattle, WashingtonMarch 2026Not statedA-104 The carbon results framework project: the goal of the ec3 tool project is to transform building construction by transparently measuring comparing and reducing embodied carbon emission from construction materials. each year the built environment contributes almost 40% of co2 emission worldwide and it is estimated that there will be a doubling of the amount of building floorspace in the next 40 years. at least half of the carbon footprint of these new building will take the form of embodied carbon in the emissions associated with the building construction including extracting transporting manufacturing and installing building materials. as a result owners designers engineers and contactors are turning their attention to building material seeking information on these products so they can make informed smart choices. the ec3 tool would enable the building industry to easily access and view material carbon emissions data.
Charles Pankow FoundationMcLean, VirginiaMarch 2026Not statedrga 01-22 Behavior of modular steel plate floor assemblies: this project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the aisc for initiative to reduce the time from conception to occupancy for steel building structures.
Charles Pankow FoundationMcLean, VirginiaMarch 2026Not statedRGA -5-22 Performance based structural fire design for authorities having jurisdiction officials: this project will develop educational training materials to introduce AJH to the topic of performance-based structural fie design pbsfd. These materials will assist AHJ to gain an understanding of the goals objectives fire scenarios thermal and structural analyses for pbsfd. After completing the training ahj will be able to review pbsdf designs along with their assumptions limitations can caveats. They will be able to effectively manage relationships between the engineering team and the peer review panel and make final decisions based on buildings codes for steel concrete masonry and wood structures. The educations materials will include slides recorded presentations guideline documents recordings of live workshops seminars and discussions by expert panels in the field of structural fire engineering fire protection engineering and performance-based design.
Charles Pankow FoundationHaymarket, VirginiaMarch 2026Not statedRGA 03-23:Behavior of modular steel plate floor assemblies: this project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the aisc for initiative to reduce the time from conception to occupancy for steel building structures. This is the next phase after RGA 01-22.
2030 Inc Architecture 2030 IncSanta Fe, New MexicoMarch 2025$50,000A-105: Climate Positive Design for the Exterior Built Environment: Identify gaps areas for usage improvemet and integration with the existing Pathfinder tool and existing dataset. Update the tool with currently existing planning and landscape datasets as well as basic civil materials. Execute tool interface and output advancement capabilities.
Charles Pankow FoundationHaymarket, VirginiaMarch 2025$50,000RGA 03-23:Behavior of modular steel plate floor assemblies: this project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the aisc for initiative to reduce the time from conception to occupancy for steel building structures. This is the next phase after RGA 01-22.
Charles Pankow FoundationMcLean, VirginiaMarch 2025$31,250rga 01-22 Behavior of modular steel plate floor assemblies: this project investigates a new modular steel floor framing and diaphragm system for commercial building structures with broad applicability including high seismic zones. The proposed system has key benefits of increasing the speed of construction including eliminating the pouring of a concrete deck. This type of system is key to achieving the goals of the aisc for initiative to reduce the time from conception to occupancy for steel building structures.
Building TransparencySeattle, WashingtonMarch 2025$25,000A-104 The carbon results framework project: the goal of the ec3 tool project is to transform building construction by transparently measuring comparing and reducing embodied carbon emission from construction materials. each year the built environment contributes almost 40% of co2 emission worldwide and it is estimated that there will be a doubling of the amount of building floorspace in the next 40 years. at least half of the carbon footprint of these new building will take the form of embodied carbon in the emissions associated with the building construction including extracting transporting manufacturing and installing building materials. as a result owners designers engineers and contactors are turning their attention to building material seeking information on these products so they can make informed smart choices. the ec3 tool would enable the building industry to easily access and view material carbon emissions data.
Charles Pankow FoundationMcLean, VirginiaMarch 2025$20,000RGA 02-21 This research seeks to develop and experimentally validate bolded splice details for composite plate shear walls-concrete filled CPSW-CF to enable nationwide application of this structural system. The use of CPSW-CF structures leverage steel pre-fabrication in the shop and stay-in-place formwork to reduce the time spent on site and accelerates the construction schedule. Professor Bruneau from the University of Buffalo serves as the principal investigator.
Charles Pankow FoundationMcLean, VirginiaMarch 2025$12,500RGA #04-23 Steel Mass Timber Hybrid Diaphragms and Vibration: aims to investigate the diaphragm and vibration behavior of steel-cross laminated timber CLT floors. This research will catalyze innovation within the building construction field by enabling efficient and effective designs of steel-CLT floors. Steel-CLT buildings are currently being constructed throughout the US. However the existing design guides for diaphragm and vibration design have not been developed through experimental data. Therefore the design of steel-CLT buildings may be overly conservative.
Charles Pankow FoundationMcLean, VirginiaMarch 2025Not statedRGA -5-22 Performance based structural fire design for authorities having jurisdiction officials: this project will develop educational training materials to introduce AJH to the topic of performance-based structural fie design pbsfd. These materials will assist AHJ to gain an understanding of the goals objectives fire scenarios thermal and structural analyses for pbsfd. After completing the training ahj will be able to review pbsdf designs along with their assumptions limitations can caveats. They will be able to effectively manage relationships between the engineering team and the peer review panel and make final decisions based on buildings codes for steel concrete masonry and wood structures. The educations materials will include slides recorded presentations guideline documents recordings of live workshops seminars and discussions by expert panels in the field of structural fire engineering fire protection engineering and performance-based design.

Showing 16 of the 16 grants listed on its returns for the years ending March 2024 to March 2026. From the foundation’s Form 990-PF returns for the years ending March 2024 to March 2026.